Home | About Us | Instrumentation |Post Tensioning| Marble Mining |Ground Anchoring | Consulting | Drilling & Grouting| Contact Us | Publications

Settlement Cells are typically used for monitoring settlement below embankments on soft ground. This can be camed by either underground excavations or dewatering.

 

Applications

Monitoring local settlement for the control of roads, embankments, dams and other earth structures

Measuring of settlement or heave of foundations

Control of mining induced subsidence to avoid damage to nearby structures 

Monitoring the site effect of drainage systems

 

Special Features

High accuracy

Low weight  

Unlimited number of settlement measurement

 

Typical  Specifications

 

Model:

10000

Depth 100 m
No. of measuring point 15
Accuracy 1 mm
Readout System Digital with alarm system

 

Required information for ordering

Required accuracy

Max depth of measuring and number of measuring points

Type of reading system

 

Method Statement Download

 

 Home | About Us | Instrumentation |Post Tensioning| Marble Mining |Ground Anchoring | Consulting | Drilling & Grouting| Contact Us | Publications