More information about Sarcheshmeh open pit mine project; |
||
|
|
Sar Cheshmeh open pit mine
Client: Sar cheshmeh complex Engineer: - Instruments: Heap leach acid level meter
|
|
|
Sarcheshmeh open pit copper mine is the biggest copper
mine in Iran as well as one of the biggest in the world. The heap
leaching operations in Sarcheshmeh open pit mine is one of the peripheral
jobs that is done on the ore mineral of the mine. This is to dump the
materials in heaps and pour acid on them it in predefined intervals to solve
the copper in the rock. The copper will then be extracted from the
fluid later on by chemical processes. In this project it is very
important to know where the acid level is in the heap to make sure that it
is uniformly distributed in the rock. The distinctive characteristic of this project is in fact the need for a complete acid resistant instrument and also the possibility for the instrument to be adjusted for different acid densities. Two such instruments were manufactured fully acid resistant and send to the mine for use. An engineer from the company also attended the mine to train the personnel of the adjustment methods and safe use of the instrument. The picture of this instrument is shown bellow.
|
||
![]() |
||
|
|
||
|