Introduction:
Post-tensioning is a method of strengthening concrete with strands or bars referred to as tendons. Post tensioning application includes high rise buildings, parking structures, slabs, bridges, sport stadiums, rock and soil anchors, concrete tanks, and heavy lifting.
Using post-tensioning method helps us reduce the amount of concrete and bars used in concrete structures. In buildings it causes to have thinner slabs and reduction in weight and height. This in turn, saves mechanical system. Post-tensioning method allows us to have longer clear spans in structures as well.
In this method a number of strands are inserted into a metal or plastic duct embedded in concrete. The strands are stressed with a large, multi-strand jack or a mono jack and anchored in an anchorage device. The anchorage consists of an iron casting in which the strand is gripped by a conical, two-piece wedge. The duct is then filled with cement grout to provide corrosion protection to the strand and to bond the tendon to the concrete around the duct. There is also another type of strand that does not need any duct. It consists of a seven-wire strand that is coated with grease and encased in PE sheathing.
Services:
Payab Zamzam supplies material and equipment used in post tensioning projects as well as projects execution. The PT projects include stay cable bridges, post-tensioned bridges, high rise buildings, concrete tanks, and heavy lifting.
The material and equipment that Payab Zamzam supplies include:
Projects:
Payab Zamzam has done various services in post tensioning, ground anchoring, and heavy lifting projects in Iran that are summarized in the table below:
| No. |
Project name
|
Location | Project Nature | Type of Services | Status |
|---|---|---|---|---|---|
| 1 | Hemmat highway | Tehran | Post tensioning concrete | Supply of expansion joints and installation | completed |
| 2 | Karvansara Sangi bridge | Tehran | Post tensioning concrete | Supply of box grider formwork and all necessary bearings | completed |
| 3 | Ahvaz | Stay cable |
Supply of PT material, equipment, and execution
|
completed | |
| 4 | Emam Hossein bridge | Mashhad | Stay cable |
Supply of PT material and equipment |
completed |
| 5 | Shahid Rajaei Port | Bandar Abbas | Post tensioning concrete | Supply of PT material, equipment, and execution | completed |
| 6 | Raghoon dam | Tajikestan | Post tensioning | Supply of PT material | completed |
| 7 | Cham Mehr bridge | Pole-dokhtar | Post tensioning |
Supply of PT material, equipment, and execution
|
completed |
| 8 | Karoon Island bridge | Ahvaz | Stay cable - Arch |
Supply of PT equipment, and execution
|
completed |
| 9 |
Tehran
|
Stay cable |
Supply of PT material, equipment, and execution
|
completed | |
| 10 |
Lali |
Stay cable |
Supply of PT material and equipment |
completed | |
| 11 |
Laleh bridge
|
Tehran
|
Voided slab PT concrete |
Supply of PT material, equipment, and execution
|
completed |
| 12 | Asia-Hemmat bridge | Tehran | Voided slab PT concrete | Supply of PT material, equipment, and execution | completed |
| 13 |
LPG tank
|
Assaluye
phase 15&16 |
Post tensioning concrete |
Supply of PT material, equipment and manufacturing U-Ducts
|
completed |
| 14 | Iranpars bridge | Tehran | Voided slab PT concrete | Supply of PT material, equipment, and execution | completed |
| 15 |
IKIA
|
Special heavy lifting (strarch method) |
Supply of PT material, equipment, and execution
|
completed | |
| 16 |
Andimeshk
|
Ground anchoring |
supply of PT material, and equipment
|
completed | |
| 17 |
Masjed Soleiman dam
(power house covern) |
Masjed Soleiman
|
Ground anchoring |
supply of PT material, equipment, and execution
|
completed |
| 18 |
(surge tank) |
Masjed Soleiman
|
Ground anchoring |
Supply of PT material, equipment, and execution
|
completed |
| 19 |
Siahbisheh dam
|
Siahbisheh
|
Ground anchoring | Supply of PT material and equipment | completed |
| 20 |
LPG tank
|
Assaluye
phase 9&10 |
Post tensioning concrete |
Supply of PT material, equipment and manufacturing U-Ducts
|
completed |
| 21 | Karoon dam 3 | Izeh | Ground anchoring | Supply of PT material and equipment | completed |
| 22 | LPG tank | Siry Ilands | post tensioning concrete | Supply of PT material and equipment | completed |
Asia-Hemmat bridge, Tehran
LPG TANK, Assaluyeh
8th Ahvaz bridge, Ahvaz
Karoon Island bridge, Ahvaz